We got back from Florida this afternoon and stopped in on the way home. The roof is now finished. The framing crew is done for now, and the electrical guys are in there running wires and mounting electrical stuff. Both showers are now in, and the fireplace was being installed this afternoon.
Sorry, I didn't have the camera with me today, I'll make sure I snap some pictures tomorrow.
Thursday, March 29, 2007
Sunday, March 25, 2007
Thursday, March 22, 2007
Framing is done
The framing is now done and all of the doors and windows are in except for the front door. We did our electrical walk-through today and picked out all of the switch and box locations, all of the lighting locations, layouts for appliances, etc. I think the roofers go to work with the shingles tomorrow.
Tuesday, March 20, 2007
Monday, March 19, 2007
Porch and Bedroom Trusses
The bedrooom trusses were put up today, and the roof was sheeted on the back side. The porch trusses were also put up. The roofers showed up this afternoon and realized that they could not bring their boom truck into the neighborhood because of the new weight restrictions. Instead of carrying the shingles up ladders they decided to come back on Wednesday with one of those escalator trucks. They should have the roof shingled and done by the end of the day Friday if everything goes as planned. The windows and doors were also delivered late this afternoon. Some of them will go in first thing tomorrow morning to help break the wind inside the house. Thursday is our electrical walk-through where we'll decide where to put all of the switches, boxes, etc.
Saturday, March 17, 2007
Friday
Wednesday, March 14, 2007
Tuesday, March 13, 2007
Monday, March 12, 2007
Trusses
Heavy trucks are no longer allowed on Greenville streets as of today, but somehow a crane was delivered to our driveway at 7:00 this morning, and removed this afternoon when they were done with it.
Anyway they put up most of the trusses with the crane today, and the rest they can move into place by hand tomorrow. They should have the roof sheeted and papered by the end of the week so hopefully weather won't slow things down any more.
Friday, March 9, 2007
Monday, March 5, 2007
Thursday, March 1, 2007
2nd Floor is on
They cleared off the snow from the weekend on Tuesday morning, and brought in a couple of Bobcats to clear the front yard so the trusses could be delivered . They also got some of the joists for the 2nd floor put up.
Then today (Wednesday), they finished hanging the 2nd floor joists, built the stairs, put on the deck, and snapped chalk lines for the 2nd floor walls. I got to have some fun this afternoon going up and walking through the wall-less rooms.
They're not expecting to be able to work on Thursday or Friday, but will probably work Saturday and Sunday to make it up. By then they should have all of the 2nd floor walls up so that they can get the trusses on next week.
They're not expecting to be able to work on Thursday or Friday, but will probably work Saturday and Sunday to make it up. By then they should have all of the 2nd floor walls up so that they can get the trusses on next week.
I get a daily update from Dennis when I get out there at 5-5:30 every evening. Dennis is one of the guys on the construction crew who likes to "unwind" every day after work with a 6-pack of Busch Light in his running car. I think he's happy to stick around for an extra 15 minutes and fill me in on the days work and tomorrows plans because it means that he doesn't have to go home to the wife and kids right away.
Hopefully the freezing rain and snow isn't too bad tonight!
Hopefully the freezing rain and snow isn't too bad tonight!