They also started with the siding and trim today on the garage and the west side of the house.
Monday, April 30, 2007
Primed
Friday, April 27, 2007
Wednesday, April 25, 2007
Tuesday, April 24, 2007
Tuesday
The garage and front porch were both prepared for concrete which will be poured tomorrow. This included flattening the gravel, putting down re-bar, and installing a floor drain in the garage.
Monday, April 23, 2007
Plastered

The plastering crew got to work today and did the living room, front hall, and everything upstairs.
The siding, soffit, trim, and facia were also dropped off today.
Sunday, April 22, 2007
Ready for Plaster
On Friday the plaster crew was in and prepared the house for plastering on Monday, putting black construction paper on all of the floors, finishing the seam taping with fiberglass tape, and putting up wire mesh corner bead on all of the edges/corners. The bags of plaster and mixing drums are ready to go.
Friday, April 20, 2007
Taped
Wednesday, April 18, 2007
Basement Stairs, Sheetrocked Garage
Tuesday, April 17, 2007
Sheetrock Finished
Monday, April 16, 2007
Basement Floor, Front Door, and more Sheetrock.
Then we got Kristin's picture in the baby's room, followed by a shot of the newly poured basement floor, and then some deer tracks that I found going through the back yard.
Saturday, April 14, 2007
Thursday, April 12, 2007
Sheetrock
We met with Brett Griffin this afternoon to make several decisions including the window/door casings, baseboard, the staircase ballusters and newel posts, crown molding, and sound proofing.
It turns out the roofing crew was fined $1,500 for not wearing hard hats and safety glasses while working on our house when an OSHA agent stopped in for a random inspection. They also forgot to fasten down the house wrap after finishing with the shingles, which allowed rainwater to come through the roof last week.
Anyway, they have a heater and fans in the basement to defrost and dry it out so that they can ready the floor tomorrow so that the floor can be poured on Monday. They will continue with the drywalling, and probably put in the front door.
The next two weeks will be pretty busy with picking all the different flooring, the paint colors for all the walls, and stain colors.
Oh, and I also got a key so that I am no longer locked out!
Wednesday, April 11, 2007
Finally some pictures!
The gravel pile was being moved when I got out there today so that the delivery of sheetrock could be made this afternoon. The roughed-in plumbing in the basement was finished this morning, including the bathroom and the drain for the future bar. The basement is ready for a load of gravel and then the floor will be poured.
Tuesday, April 10, 2007
Locked Out
I wasn't able to see today's progress because they are now locking the door at the end of the day. The drywaller pulled his truck into the driveway where a load of gravel was dropped off today.
Kristin picked out the cabinets and countertops today for the kitchen, bathrooms, and the laundry room.
Kristin picked out the cabinets and countertops today for the kitchen, bathrooms, and the laundry room.
Monday, April 9, 2007
Insulation
Not much happened last week, except for the inspector's visit and a few minor corrections.
Here are the inspector's comments:
------------------------------------------------
BUILDING: Girder support - Girder above stairway and ? front door header
HEATING: 4/5/07
PLUMBING: 4/5/07
ELECTRICAL: 4/5/07
INSULATION:
UNDERGROUND:
INSPECTORS REMARKS: Garage door LVL needs lateral support. Need ladder to get into basement to check Building.
-----------------------------------------------
Today the insulation was put in all of the walls (including the garage), which were then covered in clear plastic. The water/ice/slush was pumped out of the basement and the sump pump and piping was installed.
Sorry, I didn't have my camera today, I will make sure to bring it tomorrow.
Here are the inspector's comments:
------------------------------------------------
BUILDING: Girder support - Girder above stairway and ? front door header
HEATING: 4/5/07
PLUMBING: 4/5/07
ELECTRICAL: 4/5/07
INSULATION:
UNDERGROUND:
INSPECTORS REMARKS: Garage door LVL needs lateral support. Need ladder to get into basement to check Building.
-----------------------------------------------
Today the insulation was put in all of the walls (including the garage), which were then covered in clear plastic. The water/ice/slush was pumped out of the basement and the sump pump and piping was installed.
Sorry, I didn't have my camera today, I will make sure to bring it tomorrow.
Wednesday, April 4, 2007
Inspections
Nothing photo-worthy today... most of the changes were fix-ups for the inspection. The blanket of straw on the basement floor was raked out, so they must be preparing to pour a floor soon. They'll have some standing water to deal with first, though.
Monday, April 2, 2007