The gravel pile was being moved when I got out there today so that the delivery of sheetrock could be made this afternoon. The roughed-in plumbing in the basement was finished this morning, including the bathroom and the drain for the future bar. The basement is ready for a load of gravel and then the floor will be poured.
Wednesday, April 11, 2007
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment