Saturday, April 14, 2007

Basement ready for floor
















The ceilings are now all drywalled except for the living room. Now that the basement is dried out, they poured a bunch of gravel down a makeshift funnel that you can see in one of the pictures. It was spread out and we're ready for the floor to be poured Monday.





No comments: